Больше информации по резюме будет доступно после регистрации

Зарегистрироваться
Was online yesterday at 22:19

Candidate

Male, 35 years, born on 30 July 1989

Considers offers

Turkestan, not willing to relocate, prepared for business trips

The approximate area of the job search is specified

E&I QA/QC Ex Supervisor, E&I QC Engineer, E&I QA/QC Ex Inspector

1 500 $ in hand

Specializations:
  • Other

Employment: full time

Work schedule: rotation based work

Work experience 15 years 2 months

November 2022currently
2 years 8 months

www.bolashak.com

Business Services... Show more

TCO 3GI QC Ex Compliance Lead (Ex supervisor)
Take responsibility for the management and execution of effective company assurance activities associated to Ex equipment management within the work scope. Verify that all Company and Contractor personnel associated to Ex equipment management activities are competent as per the project Ex Competency Plan. Compile regular work scope competency evidence for inclusion into the overall project verification dossier. Verify that contractor personnel have completed any required training e.g. cable gland installation training, certified training for Installers, Inspector’s, Technician’s etc. Reinforce the requirement for all installation, inspection, and commissioning personnel to have access to the pre-requisite information required to carry out the task as per the Project Ex Initial Detailed Inspection. Continually liaise and support the Contractor(s) with all installation, inspection, commissioning, and preservation issues. Ensure that a sufficient level of planned surveillance activities is being performed for inspection activities associated to notification of inspection (NFI) requests issued by the contractor. Technically evaluate Change Notice Requests (CN’s) issued by the Contractor via the 3GI SC Certification Team. Review and endorse completed Ex equipment QVD’s.
February 2022November 2022
10 months

www.bolashak.com

Business Services... Show more

TCO 3GI QC E&I Ex inspector
·​ ​ ​ ​ ​ ​ ​ ​ ​Engage with Systems Completion to ensure data interface between MCPlus and Ex Register Database, and allocation to Ex QVDs and tagged equipment are accurate and managed. ·​ ​ ​ ​ ​ ​ ​ ​Verify equipment is installed in correct area of classification. ·​ ​ ​ ​ ​ ​ ​ ​ ​Evaluate Change Notice Requests (CN’s) issued by the Contractor. Approve and endorse or reject accordingly. ·​ ​ ​ ​ ​ ​ ​ ​ ​Verify that all company and contractor personnel associated to Ex equipment management activities are competent as per the project Ex Competency Plan. Compile regular work scope competency evidence for inclusion into the overall project verification dossier. ·​ ​ ​ ​ ​ ​ ​ ​ ​Verify that contractor personnel have partaken in any required training e.g. cable gland installation training, cable termination training, certified training for Inspector’s etc. ·​ ​ ​ ​ ​ ​ ​ ​ ​Reinforce the requirement for all installation and inspection personnel to have access to the pre‐requisite information required to carry out the task as per the Project Ex Initial Detailed Inspection – Inspector Information Guide. ·​ ​ ​ ​ ​ ​ ​ ​ ​Monitoring of electrical and instrumentation installation, above and below ground, junction boxes, cable tray installation, cable pulling, dressing of cable, glanding, labeling, terminations ·​ ​ ​ ​ ​ ​ ​ ​ ​Perform Ex Inspection for Vendor equipment and COWs. ​
December 2021February 2022
3 months
Teslatan, Project Additional reboilers, West Eskene, NCOC
QC Manager
- co-ordinate and monitor the quality related activities; - identify the non-conformances; - recommend corrective action; - verify implementation of corrective actions; - change the system to prevent non-conformances recurring; - oversee the daily QA/QC operation on the Quality aspect during fabrication; - ensure that the Project Inspection Test Plan and verification activities are carried out and documented in accordance with specific procedures underlined in the Contract Specification; - review Project QA/QC manpower strength periodically and make recommendation for recruitment when necessary; - liaise directly with COMPANY, the Third Party and Regulatory Bodies on Quality matters and monitors to ensures that all incoming and outgoing NCRs are fully addressed and closed out accordingly; - supervise and oversee the Project QC Inspectors; - agree an Audit Plan with COMPANY and undertake audits according to the Quality Management Plan; - ensure that the Material Procurement is done in accordance with the requirement of Company Specifications
June 2020December 2021
1 year 7 months
Teslatan, Project -Aktogay Expansion, KAZ-Minerals

Atyrau, teslatan.kz

Construction, Real Estate, Architecture... Show more

QA/QC Manager
Create and submit for approval quality procedures, Method statement and ITP in Compliance with clients specifications and national standards. Specifying quality requirements of project materials with suppliers Investigating and setting standards for quality Ensuring that construction comply with approved procedures and drawings Writing management/technical reports and customers charters Determining training needs Acting as a catalyst for change and improvement in performance/quality Recording, analyzing and distributing statistical information, NCR, CARs, Audit findings, Monitoring site performance Supervising and support QA/QC Engineers and / or laboratory staff. Preparation of Site quality dossiers for systems(areas) and their transfer to the Precomissioning department and QC department of Contractor. Preparation of Site quality dossiers for systems(areas) and their transfer to the Precomissioning department and QC department of Contractor. Reports to Project Manager Conduct required trainings on quality issues to related personnel at site.
May 2019June 2020
1 year 2 months
TENAZ Management /Teslatan, Project - 3GPU TCO

Atyrau, www.tenazmanagement.com/

E&I QA/QC Inspector
• Organization and chairing of pre-inspection meetings • Inspection and Testing of E&I Installations as per Client Drawings ,Specifications • Interpretation of standards, Procedures codes and regulations at site • Review Drawings, suppliers documentation, for example inspection and test plans (ITPs), NDE and testing procedures. • Review suitability of vendors and Reports • Prepare NFI and send to Client with all relevant documents • Complete inspection with Client QA/QC as per approved ITP and complete QVD accordingly. • Conduct site QA/QC Surveillance inspections • Prepare and Review Field Inspection/Surveillance reports • Prepare Internal Punch lists and coordinate with site supervisor to close out all internal punch lists raised by QA/QC • Complete E&I Material inspections as per Client/Project requirements • Review and maintain calibration and Test records for Testing equipment’s at site • Inspection’s and Testing to be done as per client approved E&I Drawings, Procedures STDs etc • Process concession requests and non conformance reports. • Monitor Quality control activities and train workforce where requirements are found. • Liaison with client QC representative • Monitors ongoing construction activities to ensure that installation is carried out as per client and ROK standards. • Ensures work procedures are adhered to • Carry out general tasks assigned by the Сompletion Manager
August 2014March 2019
4 years 8 months
RTS Engineering

Almaty

IT, System Integration, Internet... Show more

Project Manager
• Manage the project taking into account integration across all areas. • Engage with stakeholders • Develop Project Plan. • Direct project resources. • Monitor and manage the project schedule. • Monitor and manage the project budget. • Monitor and manage the project risk. • Deal with operational issues. • Report to the steering committee, raising, strategic issues. • Prepare Project Status Reports and Project Change Requests for the steering committee. • Ensure project meets requirements and objectives. • Manage project team members. • Negotiate and resolve issues as they arise across areas of the project and where they impact on other activities, systems and projects. • Organize and chair project referenceand group meetings as appropriate. Completed projects • «Mobile Data Center » -Design and construction - 2014y(Customer-National Security Committee RoK) • «Calculation analytical station RAST-1KZ»-Design and construction - 2015y(Customer-Ministry of Defence RoK) • «Calculation analytical station RAST-2KZ» -Design and construction - 2017y(Customer-Ministry of Defence RoK) • «Command staff vehicle MTO»-Design and construction-2018y (Customer-Ministry of Defence RoK)
June 2013November 2014
1 year 6 months
Thales Kazakhstan Engineering

Almaty, Thalesgroup.com

Electronics, Tool Engineering, Household Appliances, Computers and Office Equipment... Show more

Assembly Engineer
• Inventory in receiving and sending freights (spare parts of radio station and finished products); • Assembly and testing of Thales radio stations (TRC9105,TRC9210,TRC 3700); • Radio communication creation by means of radio station Thales
August 2012May 2013
10 months
Kentech Kazakhstan Technical Services

Atyrau, kentech.ei

Electronics, Tool Engineering, Household Appliances, Computers and Office Equipment... Show more

a FOC(Fibre Optic Cable) technician
• opening Permit to Work (PTW) • working with the design drawings and drawing changes according to the change of the project in Autocad • measurement and documentation in construction and operation of Fiber-Optic Lines • installation of optical couplers (Jbbox) and optical cross, optical cameras ССTV • execution documents and reports for the done work • support safe team work at the workplace
April 2010August 2012
2 years 5 months
Industrial Construction Telephone Company Joint-Stock Company «BITELECOM»

Almaty, Buitelecom.kz

Telecommunications, Communications... Show more

Telecommunications engineer
• an engineer on Fiber-Optic Lines: installation of optical couplers and optical cross(ODF),GPON, FTTx • measurement and documentation in construction and operation of Fiber-Optic Lines

Skills

Skill proficiency levels
COMPEX
Instrumental
Electrical
Quality Control

Driving experience

Driver's license category B, C

About me

INTERESTS Travelling, Music, Cinema, Computer Games, Sports COMPUTER SKILLS OS Windows: MS Office (all programs), Autocad, Pinnacle Studio, JDSU, MS Windows Server 2003 (Active Directory settings) OS Linux: (CentOS 6, Ubuntu 11.04, Network settings and monitoring, DHCP servers, Samba file server, DNS(BIND) server, MySQL database server, SQUID proxy server, HTTP server’s basic settings, user accounts management, assignment of quotas, routing management (ip table)

Higher education (master)

2021
Khoja Akhmet Yassawi International Kazakh-Turkish University
Engineering , Electricity
2013
Almaty Universityof Power Engineering and Telecommunications, Almaty, Kazakhstan
Radio-engineering, Electronics and Telecommunications, Master
2010
Almaty Institute of Power Engineering and Telecommunications, Almaty, Kazakhstan
Radio-engineering, Electronics and Telecommunications, Bachelor

Languages

UzbekNative


EnglishC1 — Advanced


KazakhC2 — Proficiency


RussianC2 — Proficiency


Professional development, courses

2022
Theoretical&practical instruction on Tube Fitting Installation and Tube Inspection Training Conducted be SWAGELOK
SWAGELOK
2021
Compex EX 01-04
JTL Group, Horizon
2021
H2S OPITO
YKK
2021
HSE Induction NCOC
YKK
2021
WAH
YKK
2021
Qualification certificate of Electrical Engineer of engineering networks and facilities(Communications and instrumentations)
BEK CONSULTING
2017
Qualification certificate of the chief designer of engineering networks and facilities(Communications and instrumentations)
SAMAG CORPARATION
2015
Course on «The practice of project management based on the standard PMI® PMBOK® Guide. UsingMS Project Professional in project management»,
Union of Project Managers of the Republic of Kazakhstan, Project management
2013
Course of professional training " Operator to assemblingThales radiostations»
Thales Kazakstan Engineering, telecommunications
2012
Course on «WRAP&TRIC», Risk assessment in the workplace, AGIP КСО Company
Sefftech
2012
«Permit to Work level 2», work along with the workflow tolerances, AGIP КСО Company
Sefftech
2012
«BOSIET»( Basic Offshore Induction&Emerjency(OPITO))
Sefftech
2012
Course on «HSE Induction», AGIP КСО Company
Sefftech
2012
Course on "Construction and operation of fiber-optic communication lines"
Industrial Construction Telephone Company Joint-Stock Company «BITELECOM», Telecommunications

Citizenship, travel time to work

Citizenship: Kazakhstan

Permission to work: Kazakhstan

Desired travel time to work: Doesn't matter